top of page

FREQUENTLY ASKED QUESTIONS
-
How can we address the issue of inaccurate cost estimates that lead to overspending and project delays?We support and implement BIM processes for projects, which will allow for accurate project programmes and scheduling (4D), progressive budgeting (5D), and meeting sustainability goals (6D).
-
What can be done to improve the effectiveness and clarity of employment policies?We write and review a comprehensive EIR that will meet the owner's needs and ensure that appointed parties follow it through to handover.
-
How can we overcome the challenges posed by a lack of experience or resources in delivering EIR projects?We assist in creating a BIM Execution Plan (BEP) that will adhere to the EIR. Provide consultancy services to support the design team in gaining the right skill sets to deliver the projects.
-
How can we manage the challenges related to staff turnover or team size issues?Our team of architects and designers can extend your existing design team to avoid resource issues such as HR problems, financial planning, training expenses, hardware, and software costs.
-
How can we effectively find the right freelancers and coordinate their work within limited collaboration timeframes?We are a one-stop solution when managing the resource pool, reducing all the problems a project lead would otherwise face. This includes managing and training our internal resources to ensure consistency and quality and deliver projects according to company standards.
-
How can we address the issues caused by outdated methods and workflows, such as 2D drawings, Excel scheduling, silo working styles, inefficient workflows, and manual counting, to make projects more predictable?We use a single source of truth to ensure accuracy and consistency, incorporate automation to minimise repetitive work, and create plugins to solve resource-heavy tasks.
-
How can we mitigate the issues caused by silo-driven workloads and human errors in value engineering?We use common data environments to maximise workflow efficiency and minimise work duplication. Our 3D models are designed with scheduling in mind, so changes in one aspect automatically reflect in others, like finishes, furniture, doors, and joinery.
-
How can we address the discrepancies between site conditions or inaccurate base build information and existing drawings?MODAEC incorporates point cloud surveys that accurately reflect site conditions. We create base-build models to reflect and ensure designers use accurate information at the beginning of the design process, which allows for precise construction drawings.
-
What can be done to help project managers more effectively track progress on site?MODAEC partners with industry leaders to provide Virtual Design and Construction (VDC) workflows that improve workflow efficiency and quality and reduce risks.
-
How can we reduce mistakes, delays, and added costs caused by using 2D models in construction?MODAEC uses 3D BIM models for better construction planning, coordination, and communication. These models reduce errors and improve efficiency; users can access information easily through various platforms.
-
Problem: Tracking ad-hoc Requests for Information (RFIs) through emails and phone calls leaves no reliable record.MODAEC Solution: MODAEC follows industry standards for shared data environment and real-time progress tracking. We use recommended platforms linked to BIM models to track and monitor construction issues. Designers can update models, and construction workers get real-time feedback. Project managers get an overview of changes through model update history.
-
Problem: Not enough time to create an optimised design solutionMODAEC Solution: We create BIM models so you can analyse and optimise designs for structural integrity, energy efficiency, and other performance criteria. This includes simulating different scenarios to identify the most efficient and cost-effective solutions.
-
Problem: Identifying issues too late in the design processMODAEC Solution: We can support a 3D digital representation of the project by creating accurate BIM models. This allows you to visualise the structure and its components more effectively. This helps engineers understand the design intent and identify potential issues before construction begins.
-
Problem: Linear approach programmes cause delaysMODAEC Solution: We support BIM EXECUTION PLANS (BEP) that facilitate a Common Data Environment. This enables collaboration among multidisciplinary teams, including architects, engineers, contractors, and other stakeholders. Engineers can work in a shared digital environment, reducing the likelihood of conflicts and miscommunications.
-
Problem: Inefficient and inaccurate clash detectionMODAEC Solution: BIM models automate clash detection. We identify and resolve conflicts between different building components, reducing on-site clashes during construction and lowering costs.
-
Problem: Tender costs take time to produce with limited accuracyMODAEC Solution: MODAEC supports the automatic extraction of quantities and detailed information about materials from the digital model. This streamlines cost estimation and helps you make more accurate budget projections.
-
Problem: Drawings take too longMODAEC Solution: With the support of BIM models, engineers can generate detailed and accurate construction documentation directly from the BIM model. This includes plans, sections, and elevation, reducing the time and effort required for manual drafting.
-
Problem: Lack of accurate information for future engineersMODAEC Solution: MODAEC produces and supports BIM models for lifecycle management. Engineers can access detailed information about the building's components, making it easier to plan for maintenance and renovations in the future.
-
Problem: Inaccurate construction programmesMODAEC Solution: MODAEC can help leverage the BIM Models to produce virtual construction sequences and phasing plans (4D BIM). Engineers can visualise the construction process, identify potential logistical challenges, and optimise the construction schedule for efficiency.
-
Problem: Non-compliance with local building codes and regulationsMODAEC Solution: We support automated checks that can be performed with BIM models and software to identify potential compliance issues early in the design process.
-
Problem: Repeated visits to sitesMODAEC Solution: Creating a Common Data Environment (CDE) enables you to access BIM models online; engineers can collaborate remotely, making it easier to work with global teams or during remote work, such as during a pandemic.[BW1] [BW1]Only titles should be visible. Click though for problems and then click through for the MODAEC solution
-
Problem: Hard copy information can be lost or damaged, making it challenging to keep up-to-date.MODAEC Solution: MODAEC creates BIM models for your assets. They upload these to their digital twin platform, providing real-time access to all asset information. Building operators can use connected apps to update and maintain assets. The models use AI to track warranty information and notify facility managers for renewal, check or replacement.
-
Problem: Unclear building usage makes asset optimisation difficult.MODAEC Solution: We connect smart devices, or Internet of Things (IoT) devices, to the digital twin to provide real-time feedback on building systems. This feedback can be accessed through a mobile device, allowing building owners and operators to make informed decisions on improving asset use.
-
Problem: Too many suppliers are needed to manage space and track progress.MODAEC Solution: We believe in a "golden thread of information" approach. Our digital twin platform can read information directly from the BIM models. This means a booking system can also be updated without duplicating data as the building changes or updates. This method saves the owner time and money.
-
Problem: Maintenance issues cost tenants time and money.MODAEC Solution: BIM can improve a building's performance and longevity by providing accurate asset information, predictive maintenance, lifecycle management, visualisation and simulation, and easy access to collaboration platforms.
bottom of page